Harnessing solar energy for a sustainable future
We build solar plants for homes, factories and farmland — pairing heavy-duty structural engineering with high-efficiency panels, and handling everything from the first roof survey to your subsidy credit.
- Waterproof mounting
- 150 km/h wind rated
- Direct subsidy credit
- 25-year warranty

Proof in every kilowatt
- 6,000+Homes solarised
- 40 MW+Capacity installed
- 20+Cities served
- 150+Engineers & technicians
- 9+Years of expertise
- 95%Max bill reduction
- ₹78,000Max direct subsidy
- 25 yrsPerformance guarantee
Engineered solar solutions
Residential Rooftop Solar
Up to 95% off your bill
Turn an unused rooftop into a power plant. Panels, mounting and net-metering handled end to end.
- Subsidy
- Up to ₹78,000
- Panels
- Tier-1 ALMM N-Type
- Mounting
- Zero-puncture anchoring
- Warranty
- 25-year performance

Trusted where reliability isn't optional
State power utilities, municipal corporations and the state transport network rely on our engineering to deliver solar that performs for decades.

GETCO
Gujarat Energy Transmission Corporation
Power transmission
PGVCL
Paschim Gujarat Vij Company
Power distribution
MGVCL
Madhya Gujarat Vij Company
Power distribution
BMC
Bhavnagar Municipal Corporation
Municipal corporation
RMC
Rajkot Municipal Corporation
Municipal corporation
GSRTC
Gujarat State Road Transport Corporation
Public transport
Planning solar for a government, municipal or institutional site?
Calculate your savings
Zero-down EMI from ₹12,134/month.
Built to last 25 years
| Aspect | Shayonaam turnkey | Local fabricators |
|---|---|---|
| Structure | 80-micron hot-dip galvanized | Spray-painted mild steel |
| Panels | Tier-1 ALMM N-Type bifacial | Uncertified modules |
| Efficiency | 22.5%+, holds in monsoon light | Degrades over 2.5% a year |
| Paperwork | Sanctions and subsidy handled | Left to you |
| After sales | 5 years proactive maintenance | No support once paid |
| Lifespan | 25-year performance warranty | Rust within 18–24 months |
Five steps to free electricity
- 01Day 1
Shadow Survey
We measure irradiance, load and shadow on site.
- 02Day 2–3
CAD Engineering
Structural and electrical drawings sized to your roof.
- 03Week 1–2
DISCOM Sanction
We file net-metering and PM Surya Ghar registration.
- 04Day 14–16
Roof Fitting
Structures, anchors, surge protection and earthing.
- 05Week 3–4
Energisation
Inspection, net meter, monitoring live, subsidy paid.
Frequently asked questions
Will fitting damage my roof or cause leaks?
No. We use chemical anchoring with EPDM gaskets on elevated structures and never puncture the waterproofing membrane. Leak-proof is guaranteed in writing.
How does net metering work?
A bi-directional meter records what you export and what you import. Your DISCOM nets the two each cycle, and surplus units carry forward or are paid out annually.
What happens during a power cut?
An on-grid inverter shuts off for line-worker safety. If you need power through outages, we pair a hybrid inverter with a battery bank for your essential loads.
Do panels work on cloudy days?
Yes — they run on daylight, not heat. Output drops to roughly 25–45% under heavy overcast, but annual yield stays dependable.
Can a factory claim subsidies?
PM Surya Ghar is residential only. Commercial sites instead get 40% accelerated depreciation in year one, GST input credit, and OPEX/RESCO funding options.